Plans & Checklists

AFuzion provides the world’s most preferred safety-critical and aviation related development and certification products including Plans, Checklists, and Templates.
See Plans & Checklists below or the other tabs for related products.

Aviation Development Plans & Checklists

Years to make your own? Or today, ready to use, from AFuzion? Easy – can 17,000 engineers be wrong?

AFuzions’s safety-critical / aviation certification planning templates and Checklists are the most preferred and most up-to-date in the world. See below for details on:

Proprietary and available only from AFuzion: used by 17,000 engineers worldwide in 25 countries for 200+ leading aviation companies and most certification agencies including FAA, EASA, NASA, ESA, TC, CAAC, CASA, DASA, STM, INTA, RNZAF, MOD, US ARMY, US Air Force and many more. AFuzion has spent 200 person-years of expert aviation engineering time to develop these full templates; this means you begin effective aviation development/certification work immediately instead of expending 10-16 person months developing inferior plans/standards/Checklists on your own.

Reduce tomorrow’s cost, changes, and risks while maximizing aviation development and certification productivity, reusability, and compliance today.

DO-178C
PLANS,
STANDARDS, AND
CHECKLISTS

AFuzion’s Safety-Critical Software & DO-178C Planning & Standards Templates include the following: choose any combination or all for a package discount. Contact AFuzion for a free sample.

YOU ARE REQUESTING INFORMATION FOR DO-178C PLANS & STANDARDS

DO-178C PLANS & STANDARDS TEMPLATES

  • DO-178C Plan for Software Aspects of Certification
  • DO-178C Software Quality Assurance Plan
  • DO-178C Software Configuration Management Plan
  • DO-178C Software Development Plan
  • DO-178C Software Verification Plan
  • DO-178C Software Requirement Standard
  • DO-178C Software Design Standard
  • DO-178C Software Coding Standard
  • DO-178C Software Configuration Index
  • DO-178C Software Accomplishment Summary

DO-178C CHECKLISTS

  • DO-178C Plan for Software Aspects of Certification
  • DO-178C Software Quality Assurance Plan
  • DO-178C Software Configuration Management Plan
  • DO-178C Software Development Plan
  • DO-178C Software Verification Plan
  • DO-178C Software Requirements Standard
  • DO-178C Software Design Standard
  • DO-178C Software Coding Standard
  • DO-178C Software Configuration Index
  • DO-178C Software Requirements
  • DO-178C Software Design Data
  • DO-178C Source Code Review
  • DO-178C Software Test Procedures
  • DO-178C Software Verification Results
  • DO-178C Software Verification Analysis (including Traceability)
  • DO-178C Software Configuration Index
  • DO-178C Software Accomplishment Summary
  • DO-178C Stage of Involvement #1
  • DO-178C Stage of Involvement #2
  • DO-178C Stage of Involvement #3
  • DO-178C Stage of Involvement #4

AFuzion’s Safety-Critical Hardware & DO-254 Planning & Standards Templates with AMC 20-152A Compliance, include the following: choose any combination or all for a package discount. Contact AFuzion for a free sample.

YOU ARE REQUESTING INFORMATION FOR DO-254 PLANS & STANDARDS

DO-254
PLANS,
STANDARDS, AND
CHECKLISTS

DO-254 PLANS & STANDARDS TEMPLATES

  • DO-254 Plan for Hardware Aspects of Certification
  • DO-254 Hardware Process Assurance Plan
  • DO-254 Hardware Configuration Management Plan
  • DO-254 Hardware Development Plan
  • DO-254 Hardware Verification & Validation Plan
  • DO-254 Electronic Component Management Plan
  • DO-254 Hardware Requirements Standards
  • DO-254 Hardware Design Standards
  • DO-254 Hardware VHDL Coding Standards
  • DO-254 Hardware Verification & Validation Standards
  • DO-254 Hardware Archive Standards
  • DO-254 Hardware Accomplishment Summary

DO-254 CHECKLISTS

  • DO-254 Plan for Hardware Aspects of Certification
  • DO-254 Hardware Process Assurance Plan
  • DO-254 Hardware Configuration Management Plan
  • DO-254 Hardware Development Plan
  • DO-254 Hardware Verification & Validation Plan
  • DO-254 Hardware Development Standards
  • DO-254 Computer Installation & Assembly
  • DO-254 Hardware Configuration Index
  • DO-254 Hardware Requirements Document
  • DO-254 Hardware Design Document
  • DO-254 Hardware Interface Control Data
  • DO-254 Hardware Implementation
  • DO-254 Hardware Test Cases & Procedures
  • DO-254 Hardware Test Results
  • DO-254 Hardware Verification Analysis
  • DO-254 Hardware Traceability
  • DO-254 Hardware Accomplishment Summary

ARP4754A, ARP4754B, and ARP4761A
PLANS,
STANDARDS, AND
CHECKLISTS

AFuzion’s Aircraft/System ARP4754A, ARP4754B, and ARP4761A Planning & Standards Templates include the following: choose any combination or all for a package discount. Contact AFuzion for a free sample.

YOU ARE REQUESTING INFORMATION FOR ARP4754A, ARP4754B, and ARP4761A PLANS & STANDARDS

ARP4754A, ARP4754B, and ARP4761A PLANS & STANDARDS TEMPLATES

  • ARP4754A/B Failure Modes Effects Analysis (FMEA) Template
  • ARP4754A/B FHA Functional Hazard Assessment Template
  • ARP4754A/B FRACAS Template
  • ARP4754A/B System Configuration Index Template
  • ARP4754A/B PASA Preliminary Aircraft Safety Assessment Template
  • ARP4754A/B PSSA Preliminary System Safety Assessment Template
  • ARP4754A/B Project Specific Certification Plan Template
  • ARP4754A/B Aircraft-Level Safety Program Plan Template
  • Common Cause Analysis Manual Template
  • ARP4754A/B Aircraft-Level Safety Program Plan Template
  • ARP4754A/B System Accomplishments Summary (SyAS) Template
  • ARP4754A/B System Process Assurance Plan Template
  • ARP4754A/B System Development Plan Template
  • ARP4754A/B System Requirements Management Plan Template
  • ARP4754A/B System Configuration Management Plan Template
  • ARP4754A/B Validation & Verification Plan Template
  • ARP4754A/B System Requirements Standard Template
  • ARP4754A/B System Design Standard
  • ARP4754A/B System Validation & Verification Standard

ARP4754A, ARP4754B, and ARP4761A CHECKLISTS

  • ARP4754A/B  Project Specific Certification Plan (PSCP) Checklist
  • ARP4754A/B Requirements Management Plan Checklist
  • ARP4754A/B FMEA / FMES Review Checklist
  • ARP4754A/B Objectives Checklist
  • System Functional Hazard Assessment (FHA) Checklist
  • System Requirements Management Plan Checklist
  • ARP4754A/B Safety Program Plan Checklist
  • ARP4754A/B System Configuration Index Checklist
  • ARP4754A/B System Configuration Management Plan Checklist
  • ARP4754A/B System Design Review Checklist
  • ARP4754A/B System Design Standard Checklist
  • ARP4754A/B System Development Plan Checklist
  • ARP4754A/B System Process Assurance Plan Checklist
  • ARP4754A/B System Requirements Data Checklist
  • ARP4754A/B System Requirements Standard Checklist
  • ARP4754A/B System Validation & Verification Plan Checklist
  • ARP4754A/B System Validation & Verification Standard Checklist
  • ARP4754A/B System Validation Results Checklist
  • Common Cause Analysis Checklist
  • System Verification Analysis Checklist
  • System Verification Results Checklist

AFuzion’s DO-278A Planning & Standards Templates for CNS/ATM systems worldwide (in use by 25+ aviation CNS/ATM companies in 17 countries) include the following: choose any combination or all for a package discount. Contact AFuzion for a free sample.

YOU ARE REQUESTING INFORMATION FOR DO-278A CNS/ATM PLANS & STANDARDS

DO-278A CNS/ATM
PLANS,
STANDARDS, AND
CHECKLISTS

DO-278A PLANS & STANDARDS

  • DO-278A Plan for Hardware Aspects of Certification
  • DO-278A Hardware Process Assurance Plan
  • DO-278A Hardware Configuration Management Plan
  • DO-278A Hardware Development Plan
  • DO-278A Hardware Verification & Validation Plan
  • DO-278A Hardware Requirements Standards
  • DO-278A Hardware Design Standards
  • DO-278A Hardware VHDL Coding Standards
  • DO-278A Hardware Verification & Validation Standards
  • DO-278A Hardware Archive Standards
  • DO-278A Hardware Accomplishment Summary

DO-278A PLANS & STANDARDS

  • DO-278A Plan for Software Aspects of Certification
  • DO-278A Software Process Assurance Plan
  • DO-278A Software Configuration Management Plan
  • DO-278A Software Development Plan
  • DO-278A Software Verification & Validation Plan
  • DO-278A Software Requirements Standards
  • DO-278A Software Design Standards
  • DO-278A Software Coding Standards
  • DO-278A Software Accomplishment Summary

DO-278A CHECKLISTS

  • DO-278A Plan for Software Aspects of Assurance
  • DO-278A Software Quality Assurance Plan
  • DO-278A Software Configuration Management Plan
  • DO-278A Software Development Plan
  • DO-278A Software Verification Plan
  • DO-278A Software Requirements Standard
  • DO-278A Software Design Standard
  • DO-278A Software Coding Standard
  • DO-278A Software Configuration Index
  • DO-278A Software Requirements
  • DO-278A Software Design Data
  • DO-278A Source Code Review
  • DO-278A Software Test Procedures
  • DO-278A Software Verification Results
  • DO-278A Software Verification Analysis (including Traceability)
  • DO-278A Software Accomplishment Summary
  • DO-278A Stage of Involvement #1
  • DO-278A Stage of Involvement #2
  • DO-278A Stage of Involvement #3
  • DO-278A Stage of Involvement #4

DO-326A Aviation Cyber-Security Checklists

YOU ARE REQUESTING DETAILS ON AVIATION CYBER-SECURITY DO-326A/ED-202A CHECKLISTS

  • DO-326A Plan for Security Aspects of Certification (PSecAC)
  • DO-326A Security Scope Definitions, including:
    • Aircraft Security Scope Definition (ASSD)
    • System Security Scope Definition (SSSD)
    • Item Security Scope Definition (ISSD)
  • DO-326A Preliminary Security Risk Assessments, including:
    • Preliminary Aircraft Security Risk Assessment (PASRA)
    • Preliminary System Security Risk Assessment (PSSRA)
    • Preliminary Item Security Risk Assessment (PISRA)
  • DO-326A Architecture and Measures, including:
    • Aircraft Security Architecture and Measures (ASAM)
    • System Security Architecture and Measures (SSAM)
    • Item Security Architecture and Measures (ISAM)
  • DO-326A Security Verification, including:
    • Aircraft Security Verification (ASV)
    • System Security Verification (SSV)
    • Item Security Verification (ISV)
  • DO-326A Security Operator and Integrator Guidance, including:
    • Aircraft Security Operator Guidance (ASOG)
    • System Security Integrator Guidance (SSIG)
    • Item Security Integrator Guidance (ISIG)
  • DO-326A Security Risk Assessments, including:
    • Aircraft Security Risk Assessment (PASRA)
    • System Security Risk Assessment (PSSRA)
    • Item Security Risk Assessment (PISRA)
  • DO-326A Plan for Security Aspects of Certification Summary (PSecAC Summary)

Plans & Checklists

DO-178C
Plans &
Checklists
+
DO-254
Plans &
Checklists
+
ARP4754A
Plans &
Checklists
+
DO-278A
Plans &
Checklists

AFuzion’s safety-critical / aviation certification planning templates and checklists are the most preferred and most up-to-date in the World. See below for details on:

  • DO-178C Plans, Standards, and Checklist Templates
  • DO-254 Plans, Standards, and Checklist Templates
  • DO-278A Plans, Standards, and Checklist Templates
  • ARP4754A & ARP4761 Plans, Standards, and Checklist Templates

Proprietary and available only from AFuzion: used by 17,000 engineers worldwide in 25 countries for most certification agencies including FAA, EASA, NASA, ESA, TC, CAAC, CASA, DASA, STM, INTA, RNZAF, MOD, US ARMY, US Air Force and many more. AFuzion has spent 200 person-years of expert aviation engineering time to develop these full templates; this means you begin effective aviation development/certification work immediately instead of expending 10-16 person months developing inferior plans/standards/checklists on your own.

Reduce tomorrow’s cost, changes, and risks while maximizing aviation development and certification productivity, reusability, and compliance today.

DO-178C PLANS, STANDARDS, AND CHECKLISTS

AFuzion’s Safety-Critical Software & DO-178C Planning & Standards Templates include the following: choose any combination or all for a package discount. Contact AFuzion for a free sample.

CONTACT US FOR DO-178C PLANS & STANDARDS

DO-178C PLANS & STANDARDS

  • DO-178C Plan for Software Aspects of Certification
  • DO-178C Software Quality Assurance Plan
  • DO-178C Software Configuration Management Plan
  • DO-178C Software Development Plan
  • DO-178C Software Verification Plan
  • DO-178C Software Requirement Standard
  • DO-178C Software Design Standard
  • DO-178C Software Coding Standard
  • DO-178C Software Configuration Index
  • DO-178C Software Accomplishment Summary

DO-178C CHECKLISTS

  • DO-178C Plan for Software Aspects of Certification
  • DO-178C Software Quality Assurance Plan
  • DO-178C Software Configuration Management Plan
  • DO-178C Software Development Plan
  • DO-178C Software Verification Plan
  • DO-178C Software Requirements Standard
  • DO-178C Software Design Standard
  • DO-178C Software Coding Standard
  • DO-178C Software Configuration Index
  • DO-178C Software Requirements
  • DO-178C Software Design Data
  • DO-178C Source Code Review
  • DO-178C Software Test Procedures
  • DO-178C Software Verification Results
  • DO-178C Software Verification Analysis (including Traceability)
  • DO-178C Software Configuration Index
  • DO-178C Software Accomplishment Summary
  • DO-178C Stage of Involvement #1
  • DO-178C Stage of Involvement #2
  • DO-178C Stage of Involvement #3
  • DO-178C Stage of Involvement #4

DO-254 CHECKLISTS

  • DO-254 Plan for Hardware Aspects of Certification
  • DO-254 Hardware Process Assurance Plan
  • DO-254 Hardware Configuration Management Plan
  • DO-254 Hardware Development Plan
  • DO-254 Hardware Verification & Validation Plan
  • DO-254 Hardware Development Standards
  • DO-254 Computer Installation & Assembly
  • DO-254 Hardware Configuration Index
  • DO-254 Hardware Requirements Document
  • DO-254 Hardware Design Document
  • DO-254 Hardware Interface Control Data
  • DO-254 Hardware Implementation
  • DO-254 Hardware Test Cases & Procedures
  • DO-254 Hardware Test Results
  • DO-254 Hardware Verification Analysis
  • DO-254 Hardware Traceability
  • DO-254 Hardware Accomplishment Summary

DO-254 PLANS, STANDARDS, AND CHECKLISTS

AFuzion’s Safety-Critical Hardware DO-254 Planning & Standards Templates include the following: choose any combination or all for a package discount. Contact AFuzion for a free sample.

CONTACT US FOR DO-254 PLANS & STANDARDS

DO-254 PLANS & STANDARDS

  • DO-254 Plan for Hardware Aspects of Certification
  • DO-254 Hardware Process Assurance Plan
  • DO-254 Hardware Configuration Management Plan
  • DO-254 Hardware Development Plan
  • DO-254 Hardware Verification & Validation Plan
  • DO-254 Hardware Requirements Standards
  • DO-254 Hardware Design Standards
  • DO-254 Hardware VHDL Coding Standards
  • DO-254 Hardware Verification & Validation Standards
  • DO-254 Hardware Archive Standards
  • DO-254 Hardware Accomplishment Summary

ARP4754A PLANS, STANDARDS, AND CHECKLISTS

AFuzion’s Aircraft/System ARP4754A Planning & Standards Templates include the following: choose any combination or all for a package discount. Contact AFuzion for a free sample.

CONTACT US FOR ARP4754A PLANS & STANDARDS

ARP4754A PLANS & STANDARDS

  • ARP4754A FHA Functional Hazard Assessment Template
  • ARP4754A FRACAS Template
  • ARP4754A System Configuration Index Template
  • ARP4754A System-Level Program Plan Template
  • ARP4754A PASA Preliminary Aircraft Safety Assessment Template
  • ARP4754A PSSA Preliminary System Safety Assessment Template
  • ARP4754A Project Specific Certification Plan Template
  • ARP4754A Aircraft-Level Safety Program Plan Template
  • ARP4754A System-Level Safety Program Plan Template
  • ARP4754A System Process Assurance Plan Template
  • ARP4754A System Development Plan Template
  • ARP4754A System Requirements Management Plan Template
  • ARP4754A System Configuration Management Plan Template
  • ARP4754A Validation & Verification Plan Template
  • ARP4754A System Requirements Standard Template
  • ARP4754A System Design Standard
  • ARP4754A System Validation & Verification Standard
  • ARP4754A Failure Modes And Effects (FMEA)

ARP4754A CHECKLISTS

  • ARP4754A Project Specific Certification Plan (PSCP) Checklist
  • ARP4754A Requirements Management Plan Checklist
  • ARP4754A FMEA / FMES Review Checklist
  • ARP4754A Objectives Checklist
  • ARP4754A Safety Program Plan Checklist
  • ARP4754A System Configuration Index Checklist
  • ARP4754A System Configuration Management Plan Checklist
  • ARP4754A System Design Review Checklist
  • ARP4754A System Design Standard Checklist
  • ARP4754A System Development Plan Checklist
  • ARP4754A System Process Assurance Plan Checklist
  • ARP4754A System Requirements Data Checklist
  • ARP4754A System Requirements Standard Checklist
  • ARP4754A System Validation & Verification Plan Checklist
  • ARP4754A System Validation & Verification Standard Checklist
  • ARP4754A System Validation Results Checklist

DO-278A CHECKLISTS

  • DO-278A Plan for Software Aspects of Assurance
  • DO-278A Software Quality Assurance Plan
  • DO-278A Software Configuration Management Plan
  • DO-278A Software Development Plan
  • DO-278A Software Verification Plan
  • DO-278A Software Requirements Standard
  • DO-278A Software Design Standard
  • DO-278A Software Coding Standard
  • DO-278A Software Configuration Index
  • DO-278A Software Requirements
  • DO-278A Software Design Data
  • DO-278A Source Code Review
  • DO-278A Software Test Procedures
  • DO-278A Software Verification Results
  • DO-278A Software Verification Analysis (including Traceability)
  • DO-278A Software Accomplishment Summary
  • DO-278A Stage of Involvement #1
  • DO-278A Stage of Involvement #2
  • DO-278A Stage of Involvement #3
  • DO-278A Stage of Involvement #4

DO-278A CNS/ATM PLANS, STANDARDS, AND CHECKLISTS

AFuzion’s DO-278A Planning & Standards Templates for CNS/ATM systems worldwide (in use by 25+ aviation CNS/ATM companies in 17 countries) include the following: choose any combination or all for a package discount. Contact AFuzion for a free sample.

CONTACT US FOR DO-278A PLANS & STANDARDS

DO-278A PLANS & STANDARDS

  • DO-254 Plan for Hardware Aspects of Certification
  • DO-254 Hardware Process Assurance Plan
  • DO-254 Hardware Configuration Management Plan
  • DO-254 Hardware Development Plan
  • DO-254 Hardware Verification & Validation Plan
  • DO-254 Hardware Requirements Standards
  • DO-254 Hardware Design Standards
  • DO-254 Hardware VHDL Coding Standards
  • DO-254 Hardware Verification & Validation Standards
  • DO-254 Hardware Archive Standards
  • DO-254 Hardware Accomplishment Summary

Requirements
Management

Safety-Critical projects require provable requirements management and traceability. Did you know AFuzion’s Compliance Templates and Checklists are integrated with the world’s fastest- growing requirements management tool, Jama? Automate YOUR requirements management, planning, processes, and review Checklists via an integrated solution: AFuzion & Jama.

checklist for DO-178C projects

Figure: DO-178C Plan for Software Aspects Certification (PSAC) Template -Cover Page

AFuzion’s DO-178C Process and Checklist Templates provide the basis for developing and certifying software per the guidance of RTCA DO-178C.

DO-178C requires planning documents and software lifecycle documents for requirements, design, implementation, and verification. Using DO-178C and DO-254 provided templates for these documents greatly eases their preparation and approval. For an added fee, AFuzion can even develop draft documents for planning your entire DO-178C and DO-254 planning & certification effort.

DO-178C and DO-254 also requires reviews, audits and proof thereof. The best “proof” is detailed and complete DO-178C, DO-254, and ARP4754A Checklists covering the primary software lifecycle activities and artifacts. Using AFuzion’s DO-178C and DO-254 Checklists ensures that you have an appropriate framework for successfully developing and certifying your system.

Once acquired from AFuzion and customized on the first project, your DO-178C project will retain the expertise to create, customize and re-use as appropriate on future DO-178C projects. Note that the DO-178C Planning documents (five documents) can be purchased in either Template form or “Initial Draft” form. The Template form option provides the basic templates which you then modify to create an initial draft. The Initial Draft option provides for AFuzion to first create initial drafts of all five planning documents using the same template, but adding the customer’s basic product information to create an initial draft; the customer then must finalize this initial draft to create the first versions of these five planning documents.

AFuzion’s DO-178C Plans and Checklist Templates cover all phases of the system’s software project lifecycle, and are developed with DO-178C in mind. The users of these templates would need to have some basic understanding of DO-178C, such as attendance at AFuzion DO-178C training or reading the Avionics Certification book principally written by AFuzion’s founder, Vance Hilderman.

These templates and Checklists also help in getting organizations to the goal of higher SEI CMM/CMMI ratings (preferably Level 3 – 4+). Usage of AFuzion process templates and Checklists are intended to maximize the probability of project success and quality.

The regulatory agencies require that most airborne commercial systems operating within commercial airspace to comply with DO-178C and DO-254 (details can be found in the regulatory website). The planning and processes for the engineering lifecycle are required for any DO-178C and DO-254 project and those processes must be defined before initiating that phase and followed during that phase. Although Checklists are not formally required by DO-178C and DO-254, your regulatory agencies will require that you prove conformance to DO-178C and DO-254 according to your approved processes; this conformance is very difficult to achieve and prove without Checklists. In fact, nearly all DO-178C and DO-254 projects use Checklists for reviews and proof of such.

AFuzion Process Templates are meant to provide the proper framework for customization to meet the system process requirements of DO-178C. Although there is no perfect process for all programs, there are unique areas of each individual project. Each project will vary somewhat in how it chooses to define, implement, or augment the AFuzion process Templates. Factors to consider include project Design Assurance Levels, complexity, and expertise of staff, development methodology, tools/environment, and technology. The AFuzion process Templates provide the basic elements of an avionics project compliant with DO-178C and DO-254. Further, AFuzion can customize and tailor these processes by the appropriate amount as an outflow of the gap analysis process, upon request as part of the optional first draft delivery.

If there are items in the Checklists that are not applicable to your program they could simple be answered with “N/A”. It is also recommended that the Checklists be placed under your project’s configuration management (CM) system to ensure checklist integrity.

Independent reviews are always preferable to reviews done by the developer. It should be noted that the Checklists should be widely distributed to all personnel developing any avionics lifecycle item, prior to that person beginning such initiation. Thus, the checklist serves as a “report card” whereby the originator’s success is measured. When the originator understands what the independent verification reviewer will be evaluating the related hardware artifact for, the originator will more productively attain checklist compliance during development of that artifact. This applies to requirements, design, implementation, test, etc. The level of “independence for verification” required by DO-178C and DO-254 varies according to Design Assurance level (Level A through E).

For free DO-178C training videos, and training webinars on DO-254, ARP4754A, and DO-326A, freely view here: 

CNS/ATM & DO-278A: Are you up to speed? (Communication, Navigation, Surveillance, & Air Traffic Management) systems are increasingly being deployed throughout the world and beyond. On the ground, in the air, and in space: AFuzion's CEO, Vance Hilderman and an AFuzion Senior DER Jon Lynch will present.